PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation at Room 173 Facing North-East (800x600).jpg Installing conduit for temporary power Facing South-West (800x600).jpg Installing layout for the wall forms along column line 6.5 (G-C.7) Facing South-West (800x600).jpg Installing rebar along foundation wall and footings at column line 6.5 (G-C.7) Facing South-East (800x600).jpg Metal Decking at Derrick -3 3rd Floor Facing South-East (800x600).jpg Starting working on removing the lines at Cherry St Facing Noth (800x600).jpg Verizon Removing the lines at Cherry St (800x600).jpg Verizon truck at Cherry St (800x600).jpg Verizon Working on removing the light poles Facing East (800x600).jpg
Previous pageNext page Metal Decking at Derrick -3 3rd Floor Facing South-East (800x600)
Metal Decking at Derrick -3 3rd Floor Facing South-East (800x600)